Shandong Weite Transformer Factory
Call us on:+86-536-3863999   E-mail: asang@sd-weite.com
Exhibition
Home > Exhibition > Content

Power transformer maintenance

Shandong Weite Transformer Factory | Updated: Nov 30, 2016
Source:

① Oil analysis-the pressure once every three years, impurities such as performance indicators, transformers or operating at full capacity for a long time may shortenthe cycle.

② Insulation resistance, high and low pressure not less than the original ex-factoryvalue of 70% (10M), the DC resistance of the winding at the same temperature, thephase difference should not be greater than the average 2%, compared with the results of previous measurements should not be greater than 2%.

③ Transformer grounding resistance measurement once every two years.

④ Black, power cleaning and inspection cycle, determined according to the surrounding environment and loading conditions, generally six months to one year;

Main content are found during an inspection cleared of defects, porcelain bushingshell cleaning, cracking or ageing of rubber pad replacement, tighten connectionpoints check, oil fill oil, respirator silicone check replacement.

Product Categories

Fast Track

  • Feedback
    Shandong Weite Transformer Factory welcomes your comments! Please fill this form to give us feedback or report any problem when experiencing our website.
  • Quick Navigation
  • Contact Us
    Address: Economic Development Zone, Qingzhou Town, Weifang City ,Shandong Province, China
    Tel: +86-536-3863999    
    Fax: +86-536-3863999    
    E-mail: asang@sd-weite.com
Copyright © Shandong Weite Transformer Factory